Biggest project so far with the house.

murankar

Staff member
8 months ago i had to shutdown the main bathroom. I have a window in the shower that was leaking behind the old tile. There water water getting behind the fixtures that was causing to tile to do funky things. This remodle has been going on since march. When i get the money i do a little bit. This is just the begining for the house.
 

Attachments

  • PSX_20230527_110058.jpg
    PSX_20230527_110058.jpg
    91.2 KB · Views: 1
  • PSX_20230527_110130.jpg
    PSX_20230527_110130.jpg
    107.6 KB · Views: 1
  • PSX_20230527_110205.jpg
    PSX_20230527_110205.jpg
    130.2 KB · Views: 1
  • PSX_20230527_110235.jpg
    PSX_20230527_110235.jpg
    111.2 KB · Views: 1
  • PSX_20230527_110246.jpg
    PSX_20230527_110246.jpg
    91.3 KB · Views: 1
Top Bottom